Local Plan Part 2: Sites and Development Management
The Local Plan Part 2: Sites and Development Management sets out the detailed proposals and policies required to implement the planning strategy for the area agreed through the Core Strategy 2009 (PDF) [871KB] . The Plan includes the allocation of a limited amount of greenfield land for new development required to meet the local need for additional housing, affordable housing and employment land.
On 14 April 2014 the Council adopted the Local Plan Part 2: Sites and Development Management DPD.
The document, adoption statement and policies maps can be seen below.
Local Plan Part 2: Sites and Development Management Document
The sections for the document and the adoption statement can be downloaded below.
Contents and Section 1: Introduction (PDF) [736KB]
Section 2: Development Management Policies (PDF) [443KB]
Section 3: Site-specific proposals Totton and the Waterside (PDF) [6MB]
Section 4: Site-specific proposals The Coastal Towns and Villages (PDF) [6MB]
Adoption Statement (PDF) [72KB]
Policies Maps
The policies map can be downloaded below.
Overview Totton and the Waterside (PDF) [16MB]
Overview Coastal Towns and Villages (PDF) [6MB]
Overview Ringwood, Fordingbridge, the Avon Valley and Downlands (PDF) [18MB]
Map 1A Totton Town Centre (PDF) [2MB]
Map 3A Hythe Town Centre (PDF) [2MB]
Map 4 Hardley Holbury Blackfield Langley Fawley (PDF) [7MB]
Map 5 Lymington and Pennington (PDF) [7MB]
Map 5a Lymington Town Centre (PDF) [3MB]
Map 6 Milford on Sea (PDF) [2MB]
Map 9 New Milton and Barton on Sea (PDF) [7MB]
Map 9A New Milton Town Centre (PDF) [2MB]
Map 12a Ringwood Town Centre (PDF) [1MB]
Map 13 Ellingham Harbridge Ibsley (PDF) [2MB]
Map 14 Fordingbridge, Ashford and Sandleheath (PDF) [6MB]
Map 14a Fordingbridge Town Centre (PDF) [1MB]
Map 16 Whitsbury, Rockbourne (PDF) [2MB]
Map 19 Coastal Change Management Areas (PDF) [3MB]